Sealing Below-Grade Block

Tidbits from the Top Sealing Below-Grade Block   If a concrete floor is placed at an elevation where any of the ground around it is within six inches of the floor surface or above it, block is the most common choice. If block must be used, the next consideration...

What to Expect When You Call

Tidbits from the Top What to expect when you call   You finally made the decision to inquire about that dream building, but what questions are going to be asked?  We will start by verifying the location of the building site and your contact information so we can...

Seasonal Concrete

Tidbits from the Top Seasonal Concrete   Economy Garages has the tools and knowledge to pour concrete year-round, but does that mean we should.  Our policy is to pour concrete on days when the daytime temperature is expected to reach a minimum of 20 degrees.  It...

Snow Removal/Access

Tidbits from the Top Snow Removal/Access   Economy Garages constructs buildings throughout most winters; however, the access to the building location must be maintained by removing any snow build-up.  The snow must not be plowed or thrown onto or in front of the...

Sequence of Building

Tidbits from the Top Sequence of BUilding   Everyone has heard “don’t put the cart before the horse”, right?  In construction, there is an order of doing things that should be followed so recently completed projects are not destroyed.  Planting grass, installing...