by admin | Jun 6, 2023 | All, General Industry, Materials, The "Economy Garages" Way, Tidbits from the Top
Tidbits from the Top Windows – Stock Vs. Delivery Economy Garages stocks 4’ x 2’ glider windows in white and clay. They are insulated units that glide on metal rollers for years of smooth operation. A window’s measurements are always shown as “width” x...
by admin | May 23, 2023 | All, Concrete, The "Economy Garages" Way, Tidbits from the Top
Tidbits from the Top Building Phases – Concrete The concrete phase consists of the completion of all concrete including garage floors, aprons, driveways, and block. The concrete crew will dig the grade beam area, square and set the forms to the proper height,...
by admin | May 3, 2023 | All, Building, Planning/Codes, The "Economy Garages" Way, Tidbits from the Top
Tidbits from the Top Gable Vs. Reverse Gable Styles Economy Garages uses these two terms to refer to the orientation of the trusses in reference to the garage door. A building with a gable orientation is one in which the garage door is located on the side of the...
by admin | Mar 21, 2023 | All, Planning/Codes, The "Economy Garages" Way, Tidbits from the Top
Tidbits from the Top Different State – Different Code Not all states, or their building codes, are created equal. Economy Garages builds in both Minnesota and Wisconsin. Unfortunate for contractors working in both states, they each adapted a different set of...
by admin | Mar 14, 2023 | All, The "Economy Garages" Way, Tidbits from the Top
Tidbits from the Top Building Phases Economy Garages breaks up the construction of a garage into four distinct phases: Permit, Excavation, Concrete, and Building. Each phase uses different people or crews which possess very different skill sets. Permits – the process...
by admin | Feb 22, 2023 | All, Planning/Codes, The "Economy Garages" Way, Tidbits from the Top
Tidbits from the Top Sales Visit – Why? A site visit from one of our Sales Representatives is a requirement to ensure all challenges, risks and concerns are discussed prior to locking into a contract for a new building. Elevation changes, access, existing...